Process for Interior Decorating work as per specifications. · Remove or cover fixtures and fittings. · Sheet over all areas where required. · Sand bare plaster. · Prepare woodwork ready for painting. · Apply one coat of Tikkurila optiva primer to new plaster. · Sand walls/ceilings/woodwork. · Apply two full coats of desired colour/finish to walls/ceilings/woodwork. · Re-fit fixtures and fittings and clean through. Excludes windows, doors, Bi-fold doors, main staircase, shelves, wardrobes and wallpapering. Materials does not include paint. Walls/Ceilings to be sanded down between coats with Mirka sanders. 2ndfloor area = 40l primer 1st Floor = 100l primer Ground floor = 120l primer
Easily hire and pay trusted trades people with Grafter.